Alarata
Konya-Karaman Hızlı Tren Üst Geçidi
250 TONS

Konya-Karaman Hızlı Tren Üst Geçidi

Infrastructure · Konya · PYES

Company

PYES

Sector

Infrastructure

Location

Konya

Tonnage

250 t

About the Project

Konya-Karaman Hızlı Tren Üst Geçidi is one of Alarata Construction's reference projects in the Infrastructure category. Within the scope of the work carried out with PYES, the manufacturing and assembly of 250 tons of steel construction was executed single-source — from engineering design to final on-site erection.

Engineering Solution

To avoid disrupting rail traffic, the main truss of the pedestrian overpass was lifted as a single piece by mobile crane in a night-time operation and set in place.

Site Gallery

Click images to enlarge.